Mobile coverage in halls – planning, installation & commissioning
We deliver stable LTE/5G coverage in warehouses and production halls: surveys according to Wiredscore guidelines, system selection (Nextivity CEL-FI, Zyxel ZoneDAS) and turnkey implementation including documentation.
Why Haider Telekom?
Measurement & design
Walk & drive tests, frequency analysis, coverage zones & antenna placement – decision brief included.
Scalable systems
From 1,250 m² to > 100,000 m² – e.g. CEL-FI QUATRA or ZoneDAS One with active remote units.
Documentation & service
Acceptance reports (DTF/VSWR), as-built drawings, cloud monitoring & remote support on request.
Sample project: logistics hall (12,000 m²)
Example image – stock photo
Result
After the on-site survey, antenna axes and active remote units were placed to prioritize aisle zones and goods-in. The transition between hall bays was optimized with directional antennas.
- System: CEL-FI QUATRA / ZoneDAS – depending on operator & band requirements
- Documentation: heatmaps, DTF/VSWR, as-built drawings
- Option: cloud monitoring & remote maintenance
Your warehouse project – step by step
Brief call about hall size, usage zones, operators & bands.
QualiPoc walk test; optional Wi-Fi survey (TamoGraph) for a combined rollout.
Antenna layout, RU placement, power distribution, budget & timeline.
Installation, configuration, DTF/VSWR reports, handover & support.
Technology & systems
Active DAS (ZoneDAS One)
Low-loss fiber/Ethernet runs to active remote units. Scalable to many RUs – ideal for large hall complexes.
CEL-FI QUATRA
Provider-selective amplification with IntelliBoost™, 100 dB gain and uniform coverage site-wide. Ideal for 2–10k m².
Measurement & test gear
R&S QualiPoc, TamoGraph (Wi-Fi), Anritsu S332E (DTF/VSWR) – for reliable design and acceptance.
Service & monitoring
Cloud remote support, SLAs and regular health checks available as options.
FAQ – Frequently asked questions
How long does a typical hall project take?
From first call to commissioning usually 2–6 weeks – depending on size, approvals and materials.
Do we need operator approval?
Depending on system & country, carrier approval may be required. We handle the coordination.
Can existing systems be expanded?
Yes. The on-site survey shows whether additional RUs/antennas or band upgrades make sense.
A short call, then a proposal with a planning sketch.